Porch leveling at a glance
Signs your porch needs lifting
- A gap opening between the porch slab and the house wall.
- The landing tipping forward, or the top step sitting below the threshold.
- Roof posts that have lifted off the slab, or a beam that looks like it's sagging toward a post.
- Cracks across the slab with one side lower than the other.
- Water running toward the door or standing on the landing after rain.
- A hollow sound when you walk across the slab, which means there's a void under it.
How to check a sinking porch
- 1Look along the house wallA gap between the slab and the wall that's wider at the top than at the bottom means the porch is tipping away from the house. Stick painter's tape across it and date it; torn tape next season means it's still moving.
- 2Set a level on the landingPoint it straight out from the door. A porch should fall slightly away from the door. If you have to raise the end nearest the house to center the bubble, rain is running at the foundation.
- 3Look at every post baseDaylight under a post, or a post hanging above the slab, means the slab dropped out from under the roof. Photograph each one up close.
- 4Walk it and listenA dull, hollow sound under a solid porch slab means empty space below. On a porch built hollow, that space belongs there, so check the next step before reading anything into the sound.
- 5Look at the sideA concrete face that runs down to the ground is a solid porch. A block or brick wall with a vent, a small door or a crawlspace access is a hollow one.
Why porches settle
A porch is poured against the house on the soil that was dug out for the basement and pushed back in. That fill settles for years. Roof runoff lands on and around the porch, the gap at the wall opens, water runs into it, and the slab keeps dropping.
Solid, hollow, or carrying the roof?
Three things change how we approach a porch. A solid slab on fill lifts like any other slab. A porch with a hollow space underneath, common on older homes and sometimes with a crawlspace or cold cellar below, can't be fixed by filling a void that's supposed to be there; that one needs a look at how the slab is supported. And when roof posts bear on the slab, the lift has to be slow and even so the posts, the beam and the roof come up together. A photo of the side of the porch, the post bases and any cracks tells us which you have.
| What you see | What it is | What happens next |
|---|---|---|
| Concrete face down to the ground, no posts on the slab | A solid slab on fill | It lifts like any other slab |
| Roof posts standing on the slab | A solid slab carrying the roof | Lifted slowly from several holes so the slab, posts and beam rise together |
| Posts or columns on their own footings | The slab sank and the roof didn't | The slab is lifted up to meet them and the joint around each base is sealed |
| Block or brick side wall with a vent or access door | A hollow porch, sometimes over a cold cellar | Not a foam job. It needs a look at how the slab is supported |
| A wood floor on posts or piers | A framed porch | A carpenter or deck builder |
Steps are usually poured separately from the porch, so they settle separately. We lift both in one visit, the porch first so the steps can be set to meet it. Steps on their own are covered under front steps and stoops.
How we lift a porch, step by step
3D renders with the ground cut away, simplified to fewer holes than a real job. Most residential jobs take a few hours, and you can walk on the slab when we pack up.
Getting a porch ready
- Clear furniture, planters and anything heavy off the slab.
- Leave a path for a hose from the driveway to the porch.
- Tell us if a railing is fastened to both the porch and the house wall. The porch end will move and the house end won't.
- Roof posts and railings stay where they are. You don't need to be home.
When a porch needs a carpenter or a new slab instead
- It's hollow underneath. A porch over a cold cellar or crawlspace is a slab carried by the walls around it. The space below is supposed to be there, so filling it isn't the fix.
- The sag is in the framing. If the posts stand on their own footings, or the slab is still level, a sagging roof is a carpenter's job.
- A post was already shimmed, or the beam has pulled off a post. A carpenter may need to be involved before the slab comes back up. We'll tell you from the photos.
- The slab is in many pieces or crumbling. That one is replaced, and the posts are shored while it's done.
- It's a wood porch. Foam lifting is for poured concrete on the ground.
Why lift a porch instead of replacing it?
Replacing a porch slab under a roof means shoring the posts, breaking out concrete against the house, and pouring in a tight spot. A solid porch that settled can usually be lifted in an afternoon with the roof never touched.
Replacement timing is typical; a contractor's schedule and the weather can stretch it. New-concrete cure times from Concrete Network.
What porch leveling costs
A porch is usually one or two sections plus its steps, so most land near the job minimum. See the leveling cost guide.
| Porch job | Typical price |
|---|---|
| Small porch or landing | $300–$600 |
| Larger porch of one or two slabs, about 150 sq ft | $600–$1,500 |
| Job minimum | $300 |
| Steps lifted in the same visit | On the same quote |
| Sealing the joint at the house and around posts | $5–$10 per foot |
Pick the job that looks like yours.
We price by the foam the job takes, $4–$10 per sq ft on average with a $300 minimum. Add the size and how far it dropped for a closer number; your photos make it a firm price.
Pick a job or enter a size and the range appears here.
What moves it: how far it dropped, how many sections, what the slab is sitting on, and how close we can park. The cost guide explains each.
Get the firm number
Leave your name and mobile. We text you within 24 hours, and three photos make it a firm price, no site visit for most jobs.
After a porch lift: gutters, downspouts and the joint at the house
Level porch, sealed joints, and a few dime-sized gray patches where the foam went in. The patches are close to concrete color and fade into older slabs within a season. We text you before-and-after photos before we leave.
Keeping it level means keeping water out from under it. Three things do most of the work: keep the joints and cracks sealed, backfill soil against any slab edge the lift left exposed, and keep downspouts discharging away from the concrete. Sealing is its own line on your quote; the rest is in what to do after your concrete is lifted.
- Check the gutter above the porch. Roof runoff landing on and around the slab is often what softened the soil under it. Water should go down the downspout, not over the gutter's edge.
- Extend that downspout so it lets out several feet away from the porch and the foundation.
- Keep the wall joint and the joints around the posts sealed, so rain stops running in behind the slab.



