Patio leveling at a glance
Signs your patio needs lifting
- Water standing along the house after rain, or running toward the foundation instead of away.
- A gap opening between the patio and the house wall, or the patio pulling away from the steps.
- A lip at a joint or crack, with one side lower than the other.
- Cracks running across the slab, or the joints between sections opening up.
- Furniture that rocks, a grill that won't sit flat, or a patio door that catches on the slab.
- A section that sounds hollow or rocks when you step on it.
How to check your patio's slope
- 1Level and tapeSet a 4-foot level on the patio pointing straight out from the house. Raise the low end until the bubble centers, then measure the gap under that end.
- 2Golf ballSet a golf ball down a foot from the house in a few spots (a tennis ball on a rough broom finish). It should roll away from the wall.
- 3Hose or rainRun water on the slab beside the wall for a minute, or watch during a rain. It should run to the yard. If it runs to the wall or vanishes into the gap, that edge has sunk.
- 4Step and tapStep on each corner and tap the slab with a hammer handle. A corner that rocks, or a dull, drum-like sound, means there's empty space underneath.
| Gap under the end of a 4-foot level | What it means beside the house |
|---|---|
| 1 inch or more, low end away from the house | About 2% or steeper: the fall the model code calls for |
| ½ to 1 inch | About 1–2%. It drains, but slowly |
| Under ½ inch | Close to flat. Water will sit |
| You had to raise the end nearest the house | The patio is sending water at the basement wall |
Why patios end up sloping toward the house
The ground right next to a foundation is backfill from the basement dig. It settles for years after the house is built, and roof runoff keeps soaking it. The patio edge along the house sinks with it, and the whole slab ends up pitched the wrong way.
That backfill is deep, which is why a small change shows. If a 7-foot column of loose fill compresses by just 1 percent, the surface drops about 7/8 inch, and it happens only along the house, so the slab tips. Roof water does the rest. At Green Bay's normal precipitation, 1,000 square feet of roof sheds close to 20,000 gallons a year, and a downspout that lets out at the patio corner puts its share into the same fill. Why concrete settles has the whole picture.
Why a patio sloping toward the house matters
- Water that runs toward the house soaks the soil against your basement wall.
- Ice forms in the low corner every winter.
- Furniture rocks and doors that open onto the patio start to catch.
How we fix the slope, step by step
3D renders with the ground cut away, simplified to fewer holes than a real job. Most residential jobs take a few hours, and you can walk on the slab when we pack up.
Lifting a patio that's against the house
The foam pushes up on the slab, not on the wall. The house sits on footings at least 48 inches down, well below anything the foam reaches, and we keep the holes back from the foundation edge and clear of window wells. We inject in short shots and watch the joint at the wall, so the slab comes up to meet the house instead of pressing into it. The same care goes for a patio under a deck or beside an egress well.
Stamped or colored patio? Same lift, with the holes set in the grout lines and the patches tinted to blend: stamped and decorative concrete leveling.
Why lift the patio instead of replacing it?
Patios usually sit in a finished yard, next to landscaping, a deck or a door. Replacing one means breaking it out by hand or getting a machine into the backyard. Lifting needs a hose run from the truck and a few hours. For a sinking patio that's still in one piece, it's the concrete patio repair that leaves the yard alone. Patio mudjacking would get it level too, but through holes two to three times wider, with a slurry that adds weight to the same soft backfill.
Replacement timing is typical; a contractor's schedule and the weather can stretch it. New-concrete cure times from Concrete Network.
When a sunken patio can't be lifted
- A dip in the middle of a slab that otherwise drains. That's a low spot from the day the concrete was finished. Lifting moves whole slabs; it doesn't reshape the surface of one.
- A slab a root pushed up. On a walk, the neighbors can be raised to blend the edge. A patio has to stay flat for furniture and drainage, so trading a lip for a hump isn't a fix there.
- Four or more pieces, or crumbling crack edges. A patio cracked into two or three big pieces is lifted piece by piece and the cracks sealed. A web of small pieces is replaced.
- Pavers or flagstone. Loose pieces are pulled up and re-set on a re-leveled base, which isn't foam work.
Not sure which you have? How to tell when concrete is too damaged to lift shows what each looks like in a photo.
What patio leveling costs
Patios are priced by the section and the drop along the house, with a job minimum. Access matters: a patio the hose reaches easily prices lower than one behind a fenced side yard. See the leveling cost guide.
| Patio job | Typical price |
|---|---|
| Patio of one or two slabs, about 150 sq ft | $600–$1,500 |
| Bigger patios | $4–$10 per sq ft |
| Job minimum | $300 |
| Sealing the joint along the house | $5–$10 per foot |
Pick the job that looks like yours.
We price by the foam the job takes, $4–$10 per sq ft on average with a $300 minimum. Add the size and how far it dropped for a closer number; your photos make it a firm price.
Pick a job or enter a size and the range appears here.
What moves it: how far it dropped, how many sections, what the slab is sitting on, and how close we can park. The cost guide explains each.
Get the firm number
Leave your name and mobile. We text you within 24 hours, and three photos make it a firm price, no site visit for most jobs.
After a patio lift: seal the wall joint and move the water
Level patio, sealed joints, and a few dime-sized gray patches where the foam went in. The patches are close to concrete color and fade into older slabs within a season. We text you before-and-after photos before we leave.
Keeping it level means keeping water out from under it. Three things do most of the work: keep the joints and cracks sealed, backfill soil against any slab edge the lift left exposed, and keep downspouts discharging away from the concrete. Sealing is its own line on your quote; the rest is in what to do after your concrete is lifted.
- Seal the joint at the house once the slope is right. Flexible sealant over backer rod keeps roof water from running down the foundation. Sealing it while the slab still tips in would lock in the bad slope, which is why the lift comes first. More in caulking where concrete meets the house.
- Run the downspout past the patio. Roof water let out at the patio edge soaks the same backfill that settled.
- Build the soil back up along the open edges. The ground beside the house should fall at least 6 inches in the first 10 feet. Soil grading around concrete shows how.