Skip to content
(920) 655-2193|Serving Green Bay & Northeast Wisconsin
Rise & Grind Concrete
Get My Price
Concrete floor coatings · Commercial

Commercial Floor Coatings in Green Bay

3D render
  1. 1Check and repair the slab
  2. 2Diamond grind a profile
  3. 3Base coat bonds in
  4. 4Flake broadcast to full cover
  5. 5Clear topcoat takes the wear
The short answer

For showrooms, retail floors, offices, break rooms, restrooms, entryways and back rooms, a polyaspartic coating gives you a clean, durable floor that's back in use quickly: foot traffic within hours, vehicles in about a day or two. We grind and repair the slab, coat it in flake or solid color, and schedule around your hours.

By Rob Diederich, owner · Updated
Foot traffic
Within hours
Vehicles
About 24–48 hours
Finishes
Flake or solid color
Quote
From photos, within 24 hours

Commercial floor coating at a glance

Made forFoot traffic, carts and vehicles on rubber tires
Not forConstant forklift traffic, food processing or harsh chemicals, which call for specialty industrial systems we don't install
PrepBare concrete; full diamond grind with dust extraction; crack and joint repair; a moisture check where the slab is on grade
FinishesFull flake, partial flake or solid color
Film per coatAbout 6–12 mils dry (polyaspartic), so there's no lip at a doorway
InstallMost smaller spaces in a day; larger floors can be done in sections
Back in useFoot traffic within a few hours; vehicles after about 24–48 hours
Price$6–$9 per sq ft installed, $2,000 minimum
Film thickness from the ArmorGarage polyaspartic data sheet.

Where a coated floor earns its keep

Showrooms and retail

A bright, even floor that shows off what's on it and cleans up with a mop.

Offices, break rooms and restrooms

Spills wipe up, and there's no carpet or tile grout to stain.

Shops, service bays and back rooms

Oil, salt and grit stay on top of the concrete.

Entryways

Flake texture or grit for grip where snowmelt comes in.

Heavy industrial floors are a different job. Constant forklift traffic, food processing and harsh chemicals call for specialty systems. Send photos and we'll tell you honestly whether yours is a fit.

Which finish for which commercial space

SpaceFinish that fitsWhy
Showrooms and officesPartial flakeA cleaner, calmer look for rooms that stay fairly clean
EntrywaysFull flake, with gritHides tracked-in dirt and salt, and grips where snowmelt comes in
Service bays and shopsFull flake or solid colorFlake hides tire marks and wear; solid color makes a leak or a dropped part easy to spot
Back rooms, storage and mechanical roomsSolid colorA uniform floor that's easy to keep clean
RestroomsAny finish, with grit in the topcoatRestroom floors get wet
Tell us how each room is used when you send photos, and the quote will name a finish for each.

Downtime is the real cost

Epoxy floors can need several days and up to a week before vehicles go back on them. Polyaspartic cures much faster: walkable within hours and ready for vehicles in about 24 to 48 hours. Most smaller spaces are done in a day, so the work can be planned for a closed day or a weekend.

Who it's for, and who it isn't

A polyaspartic floor suits foot traffic, carts and vehicles on rubber tires: showrooms, retail floors, offices, break rooms, restrooms, entryways, service bays and back rooms. It's the same system we put in garages, so a car, boat or powersports showroom can drive on it. Constant forklift traffic, food processing and harsh chemicals call for specialty industrial systems, which we don't install. Tell us how the floor is used and we'll say whether it's a fit.

Prep is the same as a garage, done at scale

Every commercial floor gets a full diamond grind with dust extraction, repairs to cracks and joints, and a moisture check where the slab is on grade. Old coatings and sealers come off completely. Sections that settled, like a sunken slab at an overhead door, get lifted first.

What changes in a business is everything around the floor:

  • Bare concrete first. The coating goes on concrete, so carpet, tile and anything else on the slab comes up first.
  • Clearing the area. Each area has to be cleared of shelving and fixtures. Merchandise and equipment near the work should be covered or moved.
  • Dust and noise. The grinders run with dust extraction vacuums that capture most of the dust as we go. They're loud, which is one more reason most businesses book a closed day.
  • Working in sections. On a larger floor we can split the work at doorways or other clean lines and close one area at a time. The coating smell carries, so we plan ventilation for the side that stays open.
  • Grip where it gets wet. Entries, restrooms and anywhere the floor gets wet get flake texture and grit in the topcoat. The ADA standards require floors on accessible routes to be stable, firm and slip resistant, without setting a test number.
  • Edges and doorways. Each coat goes on at about 6 to 12 mils, thousandths of an inch, so the finished floor leaves no lip at a doorway. Where it stops at carpet or tile, we finish it to a clean, straight edge.

How we coat a commercial floor

  1. 1Diamond grindThe whole floor is ground with diamond tooling and vacuumed. This opens the concrete so the coating has something to bite into. No acid etching.
  2. 2Repair cracksCracks, pits and spalls are filled and ground flush so they don't show through the finished floor.
  3. 3Base coatA base coat goes down over the ground concrete. This is the layer that bonds to the slab.
  4. 4Broadcast flakeFlake is thrown into the wet base coat until it covers the floor, then the excess is scraped and vacuumed off.
  5. 5Clear topcoatA UV-stable clear topcoat locks in the flake, sets the texture for grip and takes the wear.

3D renders, not a job video; the tools are shown without the crew. Most garages are done in a day; parking time depends on the system.

Planning the closure

Most smaller spaces are coated in a day, and people can walk on the floor within a few hours. After a Sunday or holiday install you can usually open on schedule the next morning. Areas where vehicles park or drive need about 24 to 48 hours, so a showroom is better planned for a closed day or weekend with the inventory moved out.

What it costs

Commercial floors are $6–$9 per square foot installed, with a $2,000 minimum. A 1,000-square-foot showroom or shop floor runs $6,000–$9,000, and a 2,500-square-foot floor runs $15,000–$22,500. A single restroom or break room comes in at the minimum, because the setup and the steps don't shrink with the room. That covers diamond grinding, crack repair, the base coat, the flake or color and the topcoat on sound concrete. Where your floor lands depends on the square footage, crack and joint repair, any old coating to remove and the finish. Nationally, professional floor coatings run about $4 to $12 per square foot installed (HomeGuide).

Upkeep

The clear topcoat is the wear layer, so there's no wax to strip and reapply. Daily dust mopping does most of the work, since tracked-in grit is what wears a topcoat, and an auto scrubber with a soft pad and a pH-neutral cleaner is fine. If the traffic lanes dull after years of use, the topcoat can be scuffed and recoated without grinding the whole floor again.

What to send for a quote

The photo estimate form asks what kind of floor it is, its size (length and width, or square feet) and what shape it's in: bare concrete in decent shape; cracks, pits or salt damage; or an old coating or paint. Then it asks for three photos:

  • Whole floor. From the doorway, with the walls and the door in the shot.
  • Up close. Cracks, pits, salt damage or peeling, with a coin or tape for scale.
  • Edges and steps. Where the floor meets the walls, steps, a drain or the apron.
  • For a business: rough dimensions of each area, how the floor is used (foot traffic, carts or vehicles), what's on the slab now, and your hours and closed days.

You'll get a firm price by text or email within 24 hours, with anything extra, like heavy repair or an old coating to grind off, priced on the quote before you decide. More questions, including restrooms, showrooms, auto scrubbers, doorways and the warranty, are answered in the floor coating FAQ.

Sources

  1. ArmorGarage Polyaspartic 80 technical data sheet
  2. HomeGuide: garage floor coating cost
  3. HomeGuide: polyaspartic floor coating cost
Questions

Common questions

How long is a commercial space out of use for a floor coating?

Most smaller spaces are coated in a day. People can walk on a polyaspartic floor within a few hours, and vehicles can go back on it after about 24 to 48 hours. We plan the install around your closed days or a weekend.

Can you coat our floor on a day we're closed?

Yes, that's how most commercial jobs are planned. Most smaller spaces are coated in a day, and people can walk on a polyaspartic floor within a few hours, so after a Sunday or holiday install you can usually open on schedule the next morning. Areas where vehicles park need about 24 to 48 hours.

Can you coat our floor in sections so we can stay open?

Often, yes. On a larger floor we can split the work at doorways or other clean lines and close one area at a time while the rest stays in use. Each area has to be cleared of shelving and fixtures first, and the coating smell carries, so we plan ventilation for the side that's open.

Does a coated commercial floor meet ADA slip-resistance requirements?

It can, with grip built in. The ADA standards require floors on accessible routes to be stable, firm and slip resistant without setting a test number, so we add flake texture and grit in the topcoat at entries, restrooms and anywhere the floor gets wet. Walk-off mats at the door still help in winter.

Is a polyaspartic coating right for forklifts or a commercial kitchen?

Not always. It suits foot traffic, carts and vehicles on rubber tires, but constant forklift traffic, food processing and harsh chemicals call for specialty industrial systems, which we don't install. Send photos and tell us how the floor is used, and we'll tell you honestly whether yours is a fit.

How much does a commercial floor coating cost in Green Bay?

Our polyurea flake floors start at $6–$9 per square foot installed with a $2,000 minimum; nationally, professional floor coatings run about $4 to $12 (HomeGuide). Where your floor lands depends on the square footage, crack and joint repair, any old coating to remove and the finish. Send photos and rough dimensions of each area for a price by text or email within 24 hours.

Keep reading

Related

Businesses · HOAs · Property managers
Commercial & HOA

Trip hazards, sunken entrances and settled walks in Green Bay fixed with foam lifting and joint sealing, scheduled around your hours. Send photos for a quote.

Concrete floor coatings · Solid color
Solid Color Floors

Solid color polyaspartic floor coatings in Green Bay for shops, storage rooms, basements and commercial back rooms: one even color, with grit added for grip.

Coatings · Comparison
Epoxy vs. Polyaspartic

Epoxy vs. polyaspartic and polyurea garage floors: cure time, UV yellowing, hot tires, cold, road salt, cost and lifespan, and when epoxy still fits.

Get your price from a few photos

Send three phone photos and a quick measurement. You'll get a firm price by text or email within 24 hours, no site visit needed for most jobs.

Get My PriceCall (920) 655-2193